LAND & VEGETATION NEWS

30 April 2009 • David Lancaster

Why food businesses should be looking at wind power as a renewable energy source?

Corporate food businesses - retailers, manufacturers or suppliers - all need to demonstrate improved environmental performance to the increasing expectations of their consumers, customers and investors.

These food companies also need to differentiate themselves as responsible businesses both environmentally and socially, so as to improve their competitive positioning and brand loyalty.

Using wind power as a renewable energy source is both an opportunity to build asset value and secure long term green energy at lower cost, and to demonstrate a commitment to improved environment performance and reducing carbon footprint.

Average electricity costs for food businesses are typically between 6 and 8 pence per kilo watt hour, combining both day and night tariffs.

Typically a 2 mega watt single wind turbine in a geographic area that provides wind speed at about 6.5 metres per second will generate electricity that can be used on site, at a cost of about 4.94 pence per kilo watt hour and have an investment payback of about 5 years. If wind speed is above 7 metres per second, the payback period is likely to be less than 5 years.

Securing energy from wind power is an opportunity to bring both economic and environmental benefi...

Register to view all of this article »

REGISTER TO READ MORE

......it's free and easy.

We want to be able to provide you with information that relates to your specific needs. Please fill out your contact details to continue reading this article.

Simply fill in this form

Choose your username & password

(4-12 characters, letter and numbers only)

OTHER LAND & VEG ARTICLES

Protected species advice for Utility Arborists
27 February 2009

Protected species advice for Utility Arborists

Recent changes to the protection measures for wildlife and their habitats will have an impact on the way that utility tree work should be carried out. Arboricultural companies must ensure...

Advance action saves EDF Energy’s capital works programme
02 March 2009

Advance action saves EDF Energy’s capital works programme

ADAS advice to EDF Energy on protection of wildlife within the High Weald Area of Outstanding Beauty in Kent meant that permission for vital improvements to their routes could go...

Brownfield Biodiversity
06 April 2009

Brownfield Biodiversity

Open Mosaic Habitats on Previously Developed Land (Brownfield sites) has recently been included in the new list of UKBAP Priority Habitats and species. ADAS has been appointed by Defra...

Risk of rail disruption reduced by Tree Risk Assessment Programme
01 May 2009

Risk of rail disruption reduced by Tree Risk Assessment Programme

ADAS is currently undertaking the largest tree survey in Britain, having been appointed to the job by Network Rail.

AONB Management Plan available online
03 June 2009

AONB Management Plan available online

ADAS GIS and software specialists have developed an on-line GIS tool to make the management plan for the North Wessex Downs AONB more accesible to stakeholders.